A good installation result comes from a combination of a first-class floorcovering and sound expert handling.
The basis of each floor covering installation is the country-specific standards. Furthermore, the recommendations of the manufacturers of the subfloor preparation materials and adhesives have to be observed.
The following recommendations are product-specific and based on our experience and tests. If in doubt, we recommend individual adhesive tests. We do not have any influence on the correct processing of the materials involved and therefore cannot accept any warranty for the processing result.
Warranty and liability are exclusively based upon our General Terms and Conditions of Delivery and Payment.
Please observe the following recommendations before the installation of nora® floor coverings, stairtreads and accessories:
Suitable subfloors are screeds, mastic asphalt, chipboard, plywood etc.
The subfloor must fulfil the requirements of the country-specific standards regarding the readiness for installation.
Raised floor elements, chipboards, plywood etc. must be installed at the same height. In case of renovations, the elements must
be re-aligned where required.
The preparation of the subfloor has to comply with the country specific standards as well as the recommendations of the manufacturers of the subfloor preparation materials.
Before installing nora® the subfloor always has to be levelled.
Stress-free levelling compounds may exhibit a reduced absorbency. This must be taken into account when using dispersion adhesives by modifying the point of time for embedding as the water content in the dispersion adhesive has to be largely absorbed by the air. Non-absorbent subfloors must be levelled at least 3 mm thick; we recommend levelling by the rake method.
Commercially available level compounds suitable for castor-wheeled traffic have to be used. If the floor is going to be subject to heavy traffic (e. g. by fork lifts etc.) the subfloor has to be levelled with high performance levelling compounds which are for example based on polyurethane.
At the time of installation and of adhesive bonding, the subfloor temperature must be at least 15° C. Ensure that the nora® floor coverings, stairtreads and accessories have the required subfloor temperature. Especially in winter time, the material has to be stored on site for several days.
Strictly follow the recommendations and processing instructions of the manufacturer of the subfloor preparation materials. If in doubt, confirmation must be obtained from the manufacturer as to whether the material in question is suitable for a particular subfloor.
nora® floor coverings are particularly robust and resistant. They retain their properties and visual appeal over a very long period, even under extremely heavy loads. Nevertheless, misuse can cause damage like scratches and permanent residual indentations on nora® floor coverings. This damage is often caused by inappropriate or faulty chair and furniture glides or castors.
Castor-wheeled office chairs must be equipped with soft grey rolls (type W). If the floor covering is going to be subject to castor-wheeled traffic, the screed and the process materials used (e. g. levelling compound, adhesive) must be suitable for castor-wheeled traffic.
For detailled information on the installation of nora products please have a look at the download-list on the right.
Installation Recommendations – norament® floor coverings
In this guide, you will find detailed step-by-step instructions to help you install norament® floor coverings smoothly and efficiently. Covering both subfloor preparation and the correct installation method, this guide provides comprehensive information to ensure that your norament® flooring is not only aesthetically pleasing, but also durable and functional.
Cutting norament® Steptreads
How to successfully cut norament steptreads to the right size.
nora nTx installation
With nora nTx you can lay flooring quickly and easily in a few simple steps – with no waiting time.